The crane for waste management can automatically complete a series processes including waste grabbing, repeated charging, repeated shifting, parking, etc. It also features excellent anti-swing performance, real-time dynamic measurement, grab condition monitoring, automatic fault diagnosis and warning functions. In addition to waste handling, the industrial crane can also conduct slow but continuous waste feeding to fluidized bed combustion boiler. That is to say, grab opening of the waste handling crane and emptying time can be set according to actual demands so as to avoid waste stacking at the feeding port.
Technical Parameters of the Waste Handling CraneProductivity ( t/d) | 450~600 | 600~800 | 800~1000 | 1000~1200 | 1200~1500 | 1600 | ||
Lifting capacity ( t ) | 5 | 6.3 | 8 | 10 | 11 | 12.5 | 16 | |
Grab bucket | Capacity ( m³ ) | 2~2.5 | 3.2~4.2 | 4.2~5 | 5~6 | 6~6.3 | 6.3~8 | 10~12 |
Dead weight ( t ) | 2.03~2.21 | 2.91~3.3 | 3.3 | 3.3~4.9 | 4.78~4.9 | 4.78~5.8 | 7.05~9.4 | |
Duty | A6~A7 | A6~A7 | A7 | A7~A8 | A7~A8 | A7~A8 | ||
Span ( m ) | 18 | 22.5 | 22.5 | 22.5 | 22.5 | 28.5 | ||
Speed (m/min) | Hoisting | 35 | 40 | 45 | 45 | 45 | 45 | 45 |
Trolley travel | 40 | 40 | 45 | 45 | 50 | 50 | 50 | |
Crane travel | 50 | 50 | 50 | 60 | 60 | 65 | 65 | |
Total power ( KW) | 35.9 | 53.2 | 74 | 105 | 106.5 | 130.5 | 152.5 | |
Max. wheel pressure ( KN) | 90 | 110 | 140 | 160 | 170 | 190 | 226 | |
Service cable track model | 112.6 | 114 | 116 | 116 | 120a | 120a | 120a | |
Crane rail model | P24 | P38 | P43 | P43 | P50 | QU80 | QU80 |
Note:
1. Lifting capacity includes grab dead weight of grab whilst crane's total weight does not include grab dead weight;
2. Total power in the table is the power of travel mechanism, not including the power of grab control system.